top of page

The Bishops Palace

Halling, Kent

Location: Kent

 

Client: Valley of Visions

 

Sector: Public/ Ecclesiastical

 

Services: Architectural/ Repairs

 

Construction Value: £N/A

 

Building Period: Medieval

BRIEF

The Valley of Visions Landscape Partnership approached the practice to produce a condition survey, schedule of repair and administer the contract for the repairs to this Scheduled Ancient Monument.

 

CHALLENGES

The wall had been repointed in recent years with a cementitious mortar and this was beginning to cause superficial cracking and fissures within the rag stone. An experienced contractor and a sensitive approach was required to ensure no further damage was caused to the stone work during the repairs.

New stone was carefully selected from a local quarry and lime mortar samples were prepared prior to work starting to ensure seamless integration.

 

*Project undertaken during employment at Purcell LLP

Copyright © 2014 David Paine Architecture Limited | All rights reserved | Proudly created with Wix.com

  • Twitter Black Round
  • Instagram Black Round
  • Pinterest Black Round
  • Facebook Black Round
bottom of page